8/32

The base leg construction of the DZAS tower. The lack of proper equipment was no obstacle to the missionary and local staff. Here the lower sections are being put together using the sectional ladders that came with the tower, and which would eventually have to be bolted to it.
- Created on
- Saturday 1 January 1949
- Posted on
- Thursday 14 December 2017
- Dimensions
- 950*639
- File
- F00896_TwrConstr.jpg
- Filesize
- 557 KB